Septembder 24-- Officials at the Edwin I. Plant Hatch Nuclear Plant report unit 2 has been returned to service following a maintenance outage to repair a valve in the steam supply system.
The unit was safely and manually taken offline on Sept. 15 at 9:15 a.m. ET to make the necessary valve repairs. During the shutdown, unit 1 continued operating at 100 percent power.
Both units at Plant Hatch are now operating safely at full power.